Fetching from the wire…
Public story · 2026-02-12 · source-backed
A 4-million-square-foot, 1-gigawatt facility in Lebanon, Indiana — $10B+, online by late 2027/early 2028. Part of projected $115-135B full-year capex. The six largest AI infrastructure spenders are collectively on track to exceed $500B in capex in 2026. Power, not compute, is now the binding constraint.
Each link below shares sources, entities, or timing with this story.
Shared entity: Bloomberg / Same source domain / Shared topic / What happened next
Both cover Bloomberg; reported by the same outlet (bloomberg.com); overlapping topics (binding, center, constraint, data).
Shared entity: Power / Shared topic / What happened next / Tension
Both cover Power; overlapping topics (binding, center, constraint, data); picks up the Power thread on 2026-07-23.
Shared entity: Bloomberg / Same source domain / Shared topic / What happened next
Both cover Bloomberg; reported by the same outlet (bloomberg.com); overlapping topics (center, compute).
Shared entity: Bloomberg / Same source domain / What happened next / Tension
Both cover Bloomberg; reported by the same outlet (bloomberg.com); picks up the Bloomberg thread on 2026-03-01.
Shared entity: Bloomberg / Shared topic / What happened next
Both cover Bloomberg; overlapping topics (center, compute, data); picks up the Bloomberg thread on 2026-07-31.
Shared entity: Bloomberg / Same source
Both cover Bloomberg; cite the same source (Bloomberg).
Shared entity: Bloomberg / Same source domain / What happened next
Both cover Bloomberg; reported by the same outlet (bloomberg.com); picks up the Bloomberg thread on 2026-08-13.
Both cover Bloomberg; reported by the same outlet (bloomberg.com); picks up the Bloomberg thread on 2026-08-05.